GEOTETS method for simultaneous extraction of steel sheet piles and filling.
Huh! Are you going to leave that steel plate behind? What a waste!
The GEOTETS method (simultaneous filling method for soil retaining member extraction) allows for the safe extraction of soil retaining members such as steel sheet piles and H-piles, making it possible to reuse previously buried soil retaining members, thus reducing costs and considering environmental impact. By continuously filling with a specially developed filling material while extracting, this method enables the safe removal of steel sheet piles without significantly affecting the surrounding ground, contributing to site restoration. Moreover, this method can be implemented underwater wherever steel sheet piles can be extracted. We encourage you to consider the 'simultaneous filling method for soil retaining member extraction,' which enables the quick, cost-effective, and reliable reuse of previously left soil retaining members. Additionally, we will be exhibiting at the "Construction Technology Exhibition 2024 Kinki" held at Intex Osaka (Zone C, Hall 6) on November 7 (Thursday) and 8 (Friday), 2024. We sincerely look forward to your visit. 【Features】 ■ Achieves shortened construction period and cost reduction ■ Allows for close proximity construction to prevent business losses ■ High-speed simultaneous filling to suppress settlement ■ Contributes to soil contamination measures as a waterproof barrier even after soil retaining removal
- Company:協同組合Masters 地盤環境事業部会 『GEOTETS工法』
- Price:Other